Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
180
matching recommendationsSIC | 348 | Ordnance And Accessories, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0523 # 03 Y:2007 | 03 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,350,000 | $32,700 | Not Implemented |
OR0523 # 05 Y:2007 | 05 | 2007 | COVER OPEN TANKS | $3,000 | $9,000 | Not Implemented |
OR0523 # 01 Y:2007 | 01 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,000 | $60,000 | Implemented |
OR0523 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,220 | $1,160 | Implemented |
OR0523 # 02 Y:2007 | 02 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $77,000 | $5,000 | Not Implemented |
IA0394 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $2,083 | $1,969 | Not Implemented |
IA0394 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $25,628 | $15,200 | Not Implemented |
IA0394 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,584 | $15,900 | Not Implemented |
IA0394 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $17,292 | $44,400 | Not Implemented |
IA0394 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $41,729 | $4,200 | Implemented |
IA0394 # 02 Y:2006 | 02 | 2006 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $24,709 | $6,500 | Implemented |
IA0394 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,998 | $25 | Implemented |
IA0394 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,184 | $74 | Not Implemented |
AS0415 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $928 | $3,000 | Not Implemented |
AS0415 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $810 | $12,174 | Not Implemented |
AS0415 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $19,739 | $5,500 | Implemented |
AS0415 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,372 | $1,000 | Implemented |
AS0415 # 02 Y:2006 | 02 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,463 | $24,000 | Not Implemented |
AS0415 # 06 Y:2006 | 06 | 2006 | USE SOLAR HEAT TO HEAT WATER | $132 | $2,800 | Not Implemented |
CO0522 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170 | $414 | Not Implemented |
CO0522 # 03 Y:2003 | 03 | 2003 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,300 | $840 | Not Implemented |
CO0522 # 02 Y:2003 | 02 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,420 | $10,000 | Not Implemented |
CO0522 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $184 | $308 | Not Implemented |
CO0522 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,140 | $10,660 | Not Implemented |
CO0522 # 04 Y:2003 | 04 | 2003 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,870 | $1,950 | Not Implemented |