Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,344
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0554 # 05 Y:2024 | 05 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $5,553 | $84 | Implemented |
SU0554 # 09 Y:2024 | 09 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,437 | $105,375 | Implemented |
SU0554 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $82,048 | $526,750 | Implemented |
SU0554 # 02 Y:2024 | 02 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,907 | $0 | Implemented |
SU0554 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,419 | $54 | Implemented |
UD1081 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,187 | $7,000 | Implemented |
UD1081 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,626 | $7,875 | Implemented |
UD1081 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $792 | $0 | Implemented |
UD1081 # 08 Y:2024 | 08 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,404 | $0 | Implemented |
UD1081 # 03 Y:2024 | 03 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $55,362 | $1,000 | Implemented |
UD1081 # 04 Y:2024 | 04 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,442 | $0 | Implemented |
UD1081 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $621 | $16,000 | Implemented |
UD1080 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $808 | $941 | Implemented |
UD1080 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,541 | $11,151 | Implemented |
UD1080 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,018 | $924 | Implemented |
UA0284 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,762 | $8,114 | Implemented |
UA0284 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,690 | $13,427 | Implemented |
UA0284 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $479 | $500 | Implemented |
OK1106 # 05 Y:2024 | 05 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,777 | $4,495 | Implemented |
MS0424 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,613 | $19,215 | Implemented |
OK1106 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,422 | $50,026 | Implemented |
LS2404 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,458 | $11,138 | Implemented |
LS2404 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,771 | $3,080 | Implemented |
LS2404 # 01 Y:2024 | 01 | 2024 | INSTALL OCCUPANCY SENSORS | $5,988 | $275 | Implemented |
LS2404 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $135 | Implemented |