IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,321

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0527 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,524 $60 Implemented
WV0527 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,044 $165 Implemented
WV0527 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $581 $1,275 Implemented
WV0527 # 10 Y:2016 10 2016 INSULATE BARE EQUIPMENT $252 $263 Implemented
WV0527 # 11 Y:2016 11 2016 DEVELOP A REPAIR/REPLACE POLICY $212 $527 Implemented
IP0063 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $170 $5 Implemented
IP0063 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $416 $3 Implemented
IP0063 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $36 Implemented
IP0063 # 09 Y:2016 09 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $113 $112 Implemented
IP0063 # 10 Y:2016 10 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $5,185 $9,768 Implemented
IP0063 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,006 $2,156 Implemented
IP0059 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $58 Implemented
IP0059 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,602 $99 Implemented
IP0059 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $76 $62 Implemented
IP0059 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,345 $3,616 Implemented
SD0522 # 01 Y:2016 01 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $96,572 $386,410 Implemented
SD0522 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,341 $22,524 Implemented
SD0522 # 05 Y:2016 05 2016 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $8,454 $1,725 Implemented
SD0522 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,109 $1,101 Implemented
SD0522 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,917 $200 Implemented
BD0474 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,050 $2,475 Implemented
BD0474 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,083 $2,300 Implemented
BD0474 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,746 $400 Implemented
BD0474 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,446 $563 Implemented
BD0474 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $782 $425 Implemented