Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,321
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0823 # 13 Y:2010 | 13 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,010 | $50,050 | Implemented |
UD0823 # 15 Y:2010 | 15 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $355 | $25 | Implemented |
WV0406 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,098 | $49,200 | Implemented |
AM0577 # 01 Y:2010 | 01 | 2010 | INSULATE BARE EQUIPMENT | $33,500 | $1,800 | Implemented |
AM0577 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,500 | $9,155 | Implemented |
AM0577 # 03 Y:2010 | 03 | 2010 | OPTIMIZE PLANT POWER FACTOR | $6,410 | $21,100 | Implemented |
AM0577 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $17 | Implemented |
AM0577 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,660 | $300 | Implemented |
AM0577 # 11 Y:2010 | 11 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $310 | $190 | Implemented |
AM0577 # 12 Y:2010 | 12 | 2010 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $270 | $0 | Implemented |
LL0328 # 01 Y:2010 | 01 | 2010 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $26,498 | $304 | Implemented |
LL0328 # 02 Y:2010 | 02 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,654 | $3,600 | Implemented |
LL0328 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,572 | $2,800 | Implemented |
LL0327 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,425 | $4,180 | Implemented |
LL0327 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,725 | $30 | Implemented |
UM0363 # 01 Y:2010 | 01 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,083 | $500 | Implemented |
UM0363 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,498 | $10,000 | Implemented |
UM0363 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,241 | $1,000 | Implemented |
UM0363 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $2,173 | $1,375 | Implemented |
UM0363 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $542 | $1,568 | Implemented |
AM0566 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,230 | $111,190 | Implemented |
AM0566 # 03 Y:2009 | 03 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $35,170 | $1,300 | Implemented |
AM0566 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,100 | $3,000 | Implemented |
AM0566 # 05 Y:2009 | 05 | 2009 | USE SYNTHETIC LUBRICANT | $6,890 | $0 | Implemented |
AM0566 # 08 Y:2009 | 08 | 2009 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,950 | $0 | Implemented |