IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,298

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0307 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $262 $260 Implemented
WV0307 # 14 Y:2004 14 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,224 $140 Implemented
SD0344 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,981 $35,875 Implemented
SD0344 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,104 $440 Implemented
SD0344 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,399 $18,500 Implemented
CO0547 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $4,680 Implemented
CO0547 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $570 Implemented
CO0547 # 04 Y:2004 04 2004 COVER OPEN TANKS $1,200 $750 Implemented
CO0547 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $880 $240 Implemented
CO0547 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $300 $420 Implemented
NC0286 # 02 Y:2004 02 2004 REDUCE VENTILATION AIR $12,177 $35,730 Implemented
NC0286 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,904 $100 Implemented
NC0286 # 04 Y:2004 04 2004 UPGRADE CONTROLS ON COMPRESSORS $1,892 $2,000 Implemented
NC0286 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $175 $169 Implemented
NC0286 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $247 $191 Implemented
AM0468 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,520 $800 Implemented
AM0468 # 03 Y:2004 03 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,510 $760 Implemented
AM0468 # 05 Y:2004 05 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $270 $110 Implemented
AM0468 # 06 Y:2004 06 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $37,000 $0 Implemented
AM0468 # 07 Y:2004 07 2004 PAY UTILITY BILLS ON TIME $390 $0 Implemented
WI0471 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,303 $15,076 Implemented
WI0471 # 02 Y:2004 02 2004 $5,108 $59,785 Implemented
WI0471 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,338 $800 Implemented
WI0471 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $319 $640 Implemented
OK0686 # 02 Y:2004 02 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,472 $262 Implemented