IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0714 # 08 Y:2005 08 2005 USE MINIMUM SAFE OVEN VENTILATION $1,972 $150 Implemented
UD0714 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $1,311 $1,200 Implemented
UD0714 # 10 Y:2005 10 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,296 $0 Implemented
UD0714 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $1,138 $350 Implemented
UD0714 # 15 Y:2005 15 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $884 $0 Implemented
WV0307 # 03 Y:2004 03 2004 ISOLATE HOT OR COLD EQUIPMENT $3,113 $755 Implemented
WV0307 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,767 $53 Implemented
WV0307 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,177 $210 Implemented
WV0307 # 10 Y:2004 10 2004 DEVELOP A REPAIR/REPLACE POLICY $1,513 $271 Implemented
WV0307 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $0 Implemented
WV0307 # 12 Y:2004 12 2004 USE OPTIMUM THICKNESS INSULATION $278 $380 Implemented
WV0307 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $262 $260 Implemented
WV0307 # 14 Y:2004 14 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,224 $140 Implemented
WV0286 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $4,469 $3,580 Implemented
WV0286 # 03 Y:2004 03 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,072 $360 Implemented
WV0286 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,971 $250 Implemented
WV0286 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,455 $1,770 Implemented
WV0286 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,353 $251 Implemented
WV0286 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $0 Implemented
WV0286 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $828 $283 Implemented
WV0286 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $1,100 Implemented
WV0286 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $250 Implemented
UD0688 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $143,925 $500,000 Implemented
UD0688 # 03 Y:2004 03 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $31,450 $7,250 Implemented
UD0688 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $12,457 $31,250 Implemented