Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,321
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0179 # 09 Y:2004 | 09 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $726 | $629 | Implemented |
WI0455 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,710 | $2,500 | Implemented |
BD0243 # 02 Y:2003 | 02 | 2003 | INSTALL OCCUPANCY SENSORS | $13,962 | $8,250 | Implemented |
BD0243 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,415 | $1,200 | Implemented |
BD0243 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,799 | $1,965 | Implemented |
BD0243 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,406 | $1,000 | Implemented |
BD0243 # 08 Y:2003 | 08 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,277 | $2,030 | Implemented |
BD0243 # 09 Y:2003 | 09 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $0 | Implemented |
BD0243 # 10 Y:2003 | 10 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,838 | $2,460 | Implemented |
BD0243 # 17 Y:2003 | 17 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $49,200 | $1,000 | Implemented |
LE0170 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,647 | $7,000 | Implemented |
LE0170 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $952 | $0 | Implemented |
LE0170 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $367 | $0 | Implemented |
IA0323 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,618 | $1,298 | Implemented |
IA0323 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,455 | $8,642 | Implemented |
TA0061 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $31,140 | $17,080 | Implemented |
TA0061 # 03 Y:2003 | 03 | 2003 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,000 | $300 | Implemented |
TA0061 # 04 Y:2003 | 04 | 2003 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,870 | $435 | Implemented |
TA0061 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $690 | $0 | Implemented |
TA0061 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $300 | $283 | Implemented |
LM0064 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,721 | $320 | Implemented |
LM0064 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,321 | $200 | Implemented |
LM0064 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,099 | $9,475 | Implemented |
LM0064 # 06 Y:2003 | 06 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,520 | $0 | Implemented |
LM0064 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $453 | $400 | Implemented |