IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0580 # 05 Y:1999 05 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $27,840 $3,500 Implemented
UD0580 # 06 Y:1999 06 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,804 $11,744 Implemented
UD0580 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,051 $30,337 Implemented
UD0565 # 02 Y:1999 02 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $95,150 $9,000 Implemented
UD0565 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,182 $1,200 Implemented
WV0074 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,678 $3,780 Implemented
WV0074 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $254 $390 Implemented
WV0074 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $186 $500 Implemented
UD0428 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,291 $75,000 Implemented
UD0428 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,373 $2,400 Implemented
UD0428 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,231 $46,256 Implemented
UD0395 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,009 $2,080 Implemented
UD0395 # 03 Y:1993 03 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,731 $0 Implemented
UD0395 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,051 $8,096 Implemented
UD0395 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,516 $1,200 Implemented
UD0395 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $11,563 $10,625 Implemented
UD0373 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $6,664 $8,600 Implemented
UD0373 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,724 $0 Implemented
UD0373 # 04 Y:1992 04 1992 METER WASTE WATER $14,996 $300,000 Implemented
UD0339 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,489 $0 Implemented
UD0339 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,089 $0 Implemented
UD0339 # 03 Y:1991 03 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $678 $5,000 Implemented
UD0332 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $741 $624 Implemented
UD0332 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,333 $0 Implemented
UD0332 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $0 Implemented