IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,357

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0022 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,125 $1,000 Implemented
TR0022 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,666 $10,056 Implemented
TR0022 # 04 Y:2020 04 2020 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $204 $102 Implemented
TR0022 # 06 Y:2020 06 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,628 $0 Implemented
SF0548 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,764 $0 Implemented
SF0548 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $193 $0 Implemented
SF0548 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $473 $100 Implemented
SF0548 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,363 $300 Implemented
SF0548 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,653 $1,103 Implemented
SF0548 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,047 $2,930 Implemented
SF0548 # 07 Y:2019 07 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $39,924 $172,115 Implemented
WM0143 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,884 $4,500 Implemented
AM0789 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,740 $46,480 Implemented
AM0789 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $15,300 $53,500 Implemented
AM0789 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,100 $2,000 Implemented
AM0789 # 05 Y:2019 05 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,600 $0 Implemented
AM0789 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,900 $1,620 Implemented
LS1914 # 01 Y:2019 01 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,599 $164 Implemented
LS1914 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $588 $0 Implemented
LS1914 # 03 Y:2019 03 2019 USE PHOTOCELL CONTROLS $294 $226 Implemented
LS1914 # 04 Y:2019 04 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $164 $90 Implemented
NL0036 # 01 Y:2019 01 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,990 $37,155 Implemented
NL0036 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,862 $7,623 Implemented
NL0036 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $2,905 Implemented
NL0036 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $500 Implemented