Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0093 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,728 | $0 | Implemented |
UA0093 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,498 | $2,500 | Implemented |
MS0299 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,496 | $4,275 | Implemented |
MS0299 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,023 | $29,904 | Implemented |
MS0299 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,023 | $10,455 | Implemented |
MS0299 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,779 | $231 | Implemented |
MS0267 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $30,643 | $45,270 | Implemented |
MS0267 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,354 | $141,305 | Implemented |
MS0267 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $750 | $228 | Implemented |
MS0265 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,775 | $59,467 | Implemented |
MS0265 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,680 | $189 | Implemented |
MS0264 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,471 | $84,783 | Implemented |
MS0264 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,737 | $318 | Implemented |
MS0202 # 06 Y:2002 | 06 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $4,800 | $0 | Implemented |
MS0202 # 05 Y:2002 | 05 | 2002 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $571 | $173 | Implemented |
MS0202 # 04 Y:2002 | 04 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $1,270 | $100 | Implemented |
MS0202 # 03 Y:2002 | 03 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $5,910 | $800 | Implemented |
MS0202 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,165 | $2,954 | Implemented |
MS0192 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,993 | $1,000 | Implemented |
MS0192 # 03 Y:2001 | 03 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,056 | $50 | Implemented |
MS0192 # 05 Y:2001 | 05 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,153 | $3,127 | Implemented |
MS0192 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,415 | $443 | Implemented |
MS0172 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,009 | $7,649 | Implemented |
MS0172 # 04 Y:2000 | 04 | 2000 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $346 | $40 | Implemented |
MS0172 # 03 Y:2000 | 03 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $624 | $708 | Implemented |