IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0093 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,728 $0 Implemented
UA0093 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,498 $2,500 Implemented
MS0299 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,496 $4,275 Implemented
MS0299 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,023 $29,904 Implemented
MS0299 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,023 $10,455 Implemented
MS0299 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,779 $231 Implemented
MS0267 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $30,643 $45,270 Implemented
MS0267 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,354 $141,305 Implemented
MS0267 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $228 Implemented
MS0265 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,775 $59,467 Implemented
MS0265 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,680 $189 Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
MS0202 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,800 $0 Implemented
MS0202 # 05 Y:2002 05 2002 SHUT OFF PILOTS IN STANDBY EQUIPMENT $571 $173 Implemented
MS0202 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,270 $100 Implemented
MS0202 # 03 Y:2002 03 2002 USE RADIANT HEATER FOR SPOT HEATING $5,910 $800 Implemented
MS0202 # 02 Y:2002 02 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,165 $2,954 Implemented
MS0192 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,993 $1,000 Implemented
MS0192 # 03 Y:2001 03 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,056 $50 Implemented
MS0192 # 05 Y:2001 05 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,153 $3,127 Implemented
MS0192 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,415 $443 Implemented
MS0172 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,009 $7,649 Implemented
MS0172 # 04 Y:2000 04 2000 SHUT OFF PILOTS IN STANDBY EQUIPMENT $346 $40 Implemented
MS0172 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $624 $708 Implemented