Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0545 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $2,000 Implemented
LE0545 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,466 $15,150 Implemented
LE0545 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,922 $570 Implemented
LE0341 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,160 $949 Implemented
LE0341 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $1,750 Implemented
LE0341 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,980 $36,125 Implemented
LE0242 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $8,750 Implemented
LE0242 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $152 $75 Implemented
LE0242 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $996 $1,000 Implemented
LE0242 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,001 $2,000 Implemented
LE0242 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,240 $6,400 Implemented
LE0242 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,000 Implemented
LE0242 # 03 Y:2006 03 2006 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,219 $960 Implemented
LE0242 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,987 $20,000 Implemented
LE0242 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $734,219 $1,251,036 Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0101 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $26,225 $30,000 Implemented
LE0101 # 07 Y:2001 07 2001 USE OPTIMUM THICKNESS INSULATION $5,167 $2,000 Implemented
LE0101 # 06 Y:2001 06 2001 CLOSE OFF UNNEEDED STEAM LINES $3,984 $2,000 Implemented
LE0101 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $89,879 $0 Implemented
LE0101 # 04 Y:2001 04 2001 IMPROVE LUBRICATION PRACTICES $3,752 $800 Implemented
LE0101 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $78,362 $2,500 Implemented
LE0101 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,696 $500 Implemented