Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
77
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0497 # 03 Y:2021 | 03 | 2021 | COMBINE UTILITY METERS | $4,314 | $200 | Not Implemented |
AS0497 # 08 Y:2021 | 08 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $926 | $250 | Implemented |
AS0497 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $722 | $569 | Implemented |
AS0497 # 06 Y:2021 | 06 | 2021 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,560 | $453 | Not Implemented |
AS0497 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,067 | $104,184 | Implemented |
AS0497 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,810 | $9,023 | Implemented |
AS0497 # 04 Y:2021 | 04 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,053 | $678 | Implemented |
AS0497 # 05 Y:2021 | 05 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,227 | $8,870 | Implemented |
AS0497 # 07 Y:2021 | 07 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $978 | $315 | Implemented |
AS0497 # 10 Y:2021 | 10 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $152 | $287 | Implemented |
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 01 Y:2006 | 01 | 2006 | CONDENSE OPERATION INTO ONE BUILDING | $205,767 | $2,100,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0278 # 04 Y:2000 | 04 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $666 | $60 | Implemented |
AS0278 # 02 Y:2000 | 02 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $260 | $120 | Not Implemented |
AS0278 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,407 | $120 | Implemented |
AS0278 # 05 Y:2000 | 05 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $970 | $60 | Implemented |
AS0278 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,451 | $5,643 | Not Implemented |
AS0233 # 09 Y:1998 | 09 | 1998 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $11,008 | $1,480 | Implemented |
AS0233 # 07 Y:1998 | 07 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $47,175 | $480 | Implemented |
AS0233 # 01 Y:1998 | 01 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $220 | Not Implemented |
AS0233 # 03 Y:1998 | 03 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $415 | $365 | Not Implemented |