IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0586 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $22,750 $50,000 Implemented
BD0146 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,411 $23,585 Not Implemented
BD0146 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,176 $5,900 Not Implemented
BD0146 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $2,118 $1,200 Implemented
BD0146 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,884 $2,040 Not Implemented
BD0146 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $858 $600 Implemented
BD0146 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $4,333 $6,500 Not Implemented
BD0146 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $10,639 $7,000 Not Implemented
BD0146 # 08 Y:1999 08 1999 PAY BILLS ON TIME TO AVOID LATE FEES $331 $0 Not Implemented
KU0532 # 01 Y:1999 01 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,410 $17,000 Not Implemented
KU0532 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,040 $20,000 Implemented
KU0532 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,060 $12,170 Implemented
KU0532 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $450 Implemented
KU0532 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $360 Implemented
KU0532 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,410 $14,000 Not Implemented
KU0532 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $12,150 $11,640 Not Implemented
KU0532 # 08 Y:1999 08 1999 RECYCLE CLEANING SOLVENT AND REUSE $2,620 $800 Implemented
KU0529 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $660 $190 Not Implemented
KU0529 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $930 Implemented
KU0529 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $360 $700 Implemented
KU0529 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,840 $840 Implemented
UD0580 # 01 Y:1999 01 1999 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $862,392 $1,300,000 Not Implemented
UD0580 # 02 Y:1999 02 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $134,400 $400,000 Not Implemented
UD0580 # 03 Y:1999 03 1999 RECOVER AND REUSE COOLING WATER $52,000 $140,000 Not Implemented
UD0580 # 04 Y:1999 04 1999 MOVE PRODUCT USING MECHANICAL MEANS $39,393 $10,000 Not Implemented