IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0076 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $593 n/a
KG0076 # 05 Y:1997 05 1997 INSTALL TIMERS AND/OR THERMOSTATS $562 $450 n/a
KG0076 # 06 Y:1997 06 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,248 $0 n/a
KG0076 # 07 Y:1997 07 1997 RECOVER AND REUSE WASTE MATERIAL $2,333 $0 n/a
KG0076 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,557,504 $4,414 n/a
MS0073 # 01 Y:1996 01 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,103 $760 Implemented
MS0073 # 02 Y:1996 02 1996 USE PHOTOCELL CONTROLS $401 $474 Not Implemented
MS0073 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $15,682 $58,500 Not Implemented
MS0073 # 04 Y:1996 04 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $21,677 $34,294 Not Implemented
UM0072 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $800 $825 Implemented
UM0072 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,102 $8,496 Implemented
UM0072 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $4,048 $250 Not Implemented
UM0072 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $690 $1,200 Not Implemented
UM0072 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,823 $450 Implemented
UM0072 # 06 Y:1996 06 1996 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $2,500 $80 Not Implemented
NV0069 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $235 $100 Implemented
NV0069 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $678 $100 Implemented
NV0069 # 03 Y:1996 03 1996 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,603 $640 Implemented
NV0069 # 04 Y:1996 04 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,737 $3,250 Implemented
NV0069 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,122 $246 Implemented
NV0069 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $114 $114 Not Implemented
NV0069 # 07 Y:1996 07 1996 OPTIMIZE PLANT POWER FACTOR $1,686 $3,960 Implemented
NV0069 # 08 Y:1996 08 1996 ADOPT IN-HOUSE MATERIAL GENERATION $31,200 $2,000 Not Implemented
OK0509 # 01 Y:1996 01 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,243 $0 Implemented
OK0509 # 02 Y:1996 02 1996 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,966 $18,000 Implemented