Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
189
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0249 # 01 Y:2004 | 01 | 2004 | MAINTAIN MACHINES TO REDUCE LEAKS | $78,906 | $4,500 | Implemented |
UM0249 # 02 Y:2004 | 02 | 2004 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $59,835 | $55,000 | Not Implemented |
UM0249 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,288 | $20,400 | Implemented |
UM0249 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,027 | $8,138 | Implemented |
UM0249 # 05 Y:2004 | 05 | 2004 | OPTIMIZE PLANT POWER FACTOR | $6,174 | $27,270 | Implemented |
UM0249 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,436 | $975 | Implemented |
UM0205 # 01 Y:2002 | 01 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $18,000 | $5,940 | Implemented |
UM0205 # 02 Y:2002 | 02 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,300 | $15,000 | Implemented |
UM0205 # 03 Y:2002 | 03 | 2002 | REDUCE FLUID FLOW RATES | $4,604 | $1,600 | Not Implemented |
UM0205 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,937 | $11,015 | Not Implemented |
UM0205 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,362 | $300 | Implemented |
UM0205 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $932 | $1,000 | Implemented |
UM0204 # 01 Y:2002 | 01 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,500 | $27,500 | Not Implemented |
UM0204 # 02 Y:2002 | 02 | 2002 | OPTIMIZE PLANT POWER FACTOR | $2,700 | $4,970 | Implemented |
UM0204 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,220 | $1,220 | Implemented |
UM0204 # 04 Y:2002 | 04 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,160 | $500 | Implemented |
UM0204 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $960 | $1,000 | Not Implemented |
UM0204 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $330 | $375 | Implemented |
UM0167 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,108 | $4,665 | Not Implemented |
UM0167 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,795 | $100 | Not Implemented |
UM0167 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,504 | $825 | Not Implemented |
UM0167 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,167 | $500 | Not Implemented |
UM0167 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,700 | $4,550 | Not Implemented |
UM0167 # 06 Y:2000 | 06 | 2000 | INSULATE BARE EQUIPMENT | $6,118 | $3,300 | Not Implemented |
UM0167 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $16,497 | $1,000 | Not Implemented |