IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0595 # 07 Y:2000 07 2000 INCREASE USE OF AUTOMATION $367,920 $150,000 Implemented
OK0595 # 08 Y:2000 08 2000 $227,760 $30,000 Not Implemented
OK0595 # 09 Y:2000 09 2000 $36,400 $65,450 Not Implemented
AM0373 # 01 Y:2000 01 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $75,370 $0 Implemented
AM0373 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $1,650 $2,100 Implemented
AM0373 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,300 $590 Not Implemented
AM0373 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,070 $16 Implemented
AM0373 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $930 $200 Implemented
AM0373 # 06 Y:2000 06 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $710 $2,350 Implemented
AM0373 # 07 Y:2000 07 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $320 $0 Implemented
AM0373 # 08 Y:2000 08 2000 $100 $0 Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,614 $500 Not Implemented
UM0161 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,437 $500 Implemented
UM0161 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,098 $656 Not Implemented
UM0161 # 05 Y:2000 05 2000 UPGRADE OBSOLETE EQUIPMENT $5,016 $5,700 Not Implemented
WI0369 # 01 Y:2000 01 2000 USE EVAPORATION TO CONCENTRATE MATERIAL $4,974 $12,000 Not Implemented
WI0369 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $3,760 $1,200 Implemented
WI0369 # 03 Y:2000 03 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,942 $6,524 Not Implemented
WI0369 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $1,445 $1,858 Not Implemented
WI0369 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $392 $1,103 Not Implemented
WI0369 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,146 $5,097 Not Implemented
WI0369 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Implemented
WI0369 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $556 $640 Not Implemented
WV0187 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $60,258 $11,500 Not Implemented