Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0497 # 03 Y:2021 | 03 | 2021 | COMBINE UTILITY METERS | $4,314 | $200 | Not Implemented |
AS0497 # 08 Y:2021 | 08 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $926 | $250 | Implemented |
AS0497 # 09 Y:2021 | 09 | 2021 | INSTALL OCCUPANCY SENSORS | $722 | $569 | Implemented |
AS0497 # 06 Y:2021 | 06 | 2021 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,560 | $453 | Not Implemented |
AS0497 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,067 | $104,184 | Implemented |
AS0497 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,810 | $9,023 | Implemented |
AS0497 # 04 Y:2021 | 04 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,053 | $678 | Implemented |
AS0497 # 05 Y:2021 | 05 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,227 | $8,870 | Implemented |
AS0497 # 07 Y:2021 | 07 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $978 | $315 | Implemented |
AS0497 # 10 Y:2021 | 10 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $152 | $287 | Implemented |
AS0423 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,401 | $16,000 | n/a |
AS0423 # 03 Y:2006 | 03 | 2006 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,786 | $13,000 | n/a |
AS0423 # 01 Y:2006 | 01 | 2006 | CONDENSE OPERATION INTO ONE BUILDING | $205,767 | $2,100,000 | n/a |
AS0423 # 04 Y:2006 | 04 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $13,316 | $10,000 | n/a |
AS0423 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,912 | $10,000 | n/a |
AS0423 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,786 | $1,000 | n/a |
AS0278 # 04 Y:2000 | 04 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $666 | $60 | Implemented |
AS0278 # 02 Y:2000 | 02 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $260 | $120 | Not Implemented |
AS0278 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,407 | $120 | Implemented |
AS0278 # 05 Y:2000 | 05 | 2000 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $970 | $60 | Implemented |
AS0278 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,451 | $5,643 | Not Implemented |
AS0233 # 09 Y:1998 | 09 | 1998 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $11,008 | $1,480 | Implemented |
AS0233 # 07 Y:1998 | 07 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $47,175 | $480 | Implemented |
AS0233 # 01 Y:1998 | 01 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $220 | Not Implemented |
AS0233 # 03 Y:1998 | 03 | 1998 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $415 | $365 | Not Implemented |