Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0497 # 03 Y:2021 03 2021 COMBINE UTILITY METERS $4,314 $200 Not Implemented
AS0497 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $926 $250 Implemented
AS0497 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $722 $569 Implemented
AS0497 # 06 Y:2021 06 2021 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,560 $453 Not Implemented
AS0497 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,067 $104,184 Implemented
AS0497 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,810 $9,023 Implemented
AS0497 # 04 Y:2021 04 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $3,053 $678 Implemented
AS0497 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,227 $8,870 Implemented
AS0497 # 07 Y:2021 07 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $978 $315 Implemented
AS0497 # 10 Y:2021 10 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $152 $287 Implemented
AS0423 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,401 $16,000 n/a
AS0423 # 03 Y:2006 03 2006 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $13,786 $13,000 n/a
AS0423 # 01 Y:2006 01 2006 CONDENSE OPERATION INTO ONE BUILDING $205,767 $2,100,000 n/a
AS0423 # 04 Y:2006 04 2006 UPGRADE CONTROLS ON COMPRESSORS $13,316 $10,000 n/a
AS0423 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,912 $10,000 n/a
AS0423 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,786 $1,000 n/a
AS0278 # 04 Y:2000 04 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $666 $60 Implemented
AS0278 # 02 Y:2000 02 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $260 $120 Not Implemented
AS0278 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,407 $120 Implemented
AS0278 # 05 Y:2000 05 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $970 $60 Implemented
AS0278 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,451 $5,643 Not Implemented
AS0233 # 09 Y:1998 09 1998 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $11,008 $1,480 Implemented
AS0233 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $47,175 $480 Implemented
AS0233 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $220 Not Implemented
AS0233 # 03 Y:1998 03 1998 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $415 $365 Not Implemented