IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2406 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,732 $14,382 n/a
UW2406 # 05 Y:2024 05 2024 USE PHOTOCELL CONTROLS $913 $1,908 n/a
UW2406 # 04 Y:2024 04 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $234,799 $127,331 n/a
UW2406 # 03 Y:2024 03 2024 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $29,790 $91,000 n/a
UW2406 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $2,204 $4,593 n/a
UW2406 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,580 $25,000 n/a
UW2307 # 05 Y:2023 05 2023 UPGRADE OBSOLETE EQUIPMENT $878,493 $1,900,000 Implemented
UW2307 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $75,708 $310,796 Not Implemented
UW2307 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $557 $1,253 Implemented
UW2307 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,660 $0 Not Implemented
UW2307 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,807 $2,080 Not Implemented
UW0032 # 05 Y:2009 05 2009 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $297 $200 Implemented
UW0032 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,065 $3,070 Implemented
UW0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,643 $10,000 Implemented
UW0032 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,782 $31,747 Implemented
UW0032 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $8,800 $7,248 Not Implemented
UW0001 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,324 $10,082 Implemented
UW0001 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $682 $553 Not Implemented
UW0001 # 06 Y:2007 06 2007 INSTALL OCCUPANCY SENSORS $880 $1,900 Not Implemented
UW0001 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,052 $1,291 Not Implemented
UW0001 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $1,385 Not Implemented
UW0001 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,451 $13,219 Not Implemented
UW0001 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $7,373 $12,013 Not Implemented