Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
462
matching recommendationsSIC | 3491 | Industrial Valves |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0206 # 09 Y:2001 | 09 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,200 | $2,500 | Not Implemented |
NC0206 # 10 Y:2001 | 10 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,210 | $6,000 | Not Implemented |
AM0363 # 01 Y:2000 | 01 | 2000 | USE WATER BASED SPRAY ABRASIVES INSTEAD OF BAR ABRASIVES | $13,500 | $70,000 | Not Implemented |
AM0363 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,540 | $500 | Implemented |
AM0363 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $1,245 | $210 | Implemented |
AM0363 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $600 | $180 | Not Implemented |
AM0363 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $470 | $215 | Implemented |
AM0363 # 06 Y:2000 | 06 | 2000 | USE SYNTHETIC LUBRICANT | $180 | $0 | Not Implemented |
DS0147 # 01 Y:1999 | 01 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $4,412 | $3,358 | Not Implemented |
DS0147 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $343 | Not Implemented |
DS0147 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $635 | $1,156 | Not Implemented |
DS0147 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,400 | $4,365 | Not Implemented |
DS0147 # 05 Y:1999 | 05 | 1999 | BURN WASTE OIL FOR HEAT | $857 | $1,695 | Not Implemented |
DS0147 # 06 Y:1999 | 06 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $1,498 | $2,832 | Not Implemented |
DS0147 # 07 Y:1999 | 07 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $903 | $0 | Not Implemented |
AR0162 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,102 | $270 | Not Implemented |
AR0162 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $636 | $952 | Implemented |
AR0162 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $3,144 | $3,881 | Not Implemented |
AR0162 # 04 Y:1999 | 04 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $27,490 | $5,600 | Not Implemented |
AR0162 # 05 Y:1999 | 05 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $29,203 | $0 | Implemented |
AR0162 # 06 Y:1999 | 06 | 1999 | INCREASE USE OF AUTOMATION | $29,203 | $25,000 | Implemented |
WV0164 # 01 Y:1999 | 01 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,403 | $675 | Implemented |
WV0164 # 02 Y:1999 | 02 | 1999 | DISCONNECT BALLASTS | $3,291 | $320 | Implemented |
WV0164 # 03 Y:1999 | 03 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,518 | $1,128 | Not Implemented |
WV0164 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,863 | $228 | Implemented |