IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

467

matching recommendations
Reset
SIC 3491 Industrial Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0206 # 04 Y:2001 04 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $204 $525 Implemented
NC0206 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,083 $32,849 Not Implemented
NC0206 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $307 $65 Not Implemented
NC0206 # 07 Y:2001 07 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,568 $0 Not Implemented
NC0206 # 08 Y:2001 08 2001 REDESIGN PROCESS $9,810 $40,000 Implemented
NC0206 # 09 Y:2001 09 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,200 $2,500 Not Implemented
NC0206 # 10 Y:2001 10 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,210 $6,000 Not Implemented
AM0363 # 01 Y:2000 01 2000 USE WATER BASED SPRAY ABRASIVES INSTEAD OF BAR ABRASIVES $13,500 $70,000 Not Implemented
AM0363 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,540 $500 Implemented
AM0363 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $1,245 $210 Implemented
AM0363 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $600 $180 Not Implemented
AM0363 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $215 Implemented
AM0363 # 06 Y:2000 06 2000 USE SYNTHETIC LUBRICANT $180 $0 Not Implemented
DS0147 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $4,412 $3,358 Not Implemented
DS0147 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $301 $343 Not Implemented
DS0147 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $635 $1,156 Not Implemented
DS0147 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,400 $4,365 Not Implemented
DS0147 # 05 Y:1999 05 1999 BURN WASTE OIL FOR HEAT $857 $1,695 Not Implemented
DS0147 # 06 Y:1999 06 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,498 $2,832 Not Implemented
DS0147 # 07 Y:1999 07 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $903 $0 Not Implemented
AR0162 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,102 $270 Not Implemented
AR0162 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $636 $952 Implemented
AR0162 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,144 $3,881 Not Implemented
AR0162 # 04 Y:1999 04 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,490 $5,600 Not Implemented
AR0162 # 05 Y:1999 05 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,203 $0 Implemented