IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3498 Fabricated Pipe And Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0167 # 07 Y:2000 07 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $16,497 $1,000 Not Implemented
UM0167 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $6,118 $3,300 Not Implemented
UM0167 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,700 $4,550 Not Implemented
UM0167 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,167 $500 Not Implemented
UM0167 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,504 $825 Not Implemented
UM0167 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,795 $100 Not Implemented
UM0167 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,108 $4,665 Not Implemented
UM0167 # 08 Y:2000 08 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $7,288 $11,000 Not Implemented
AR0185 # 02 Y:2000 02 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,930 $0 Not Implemented
AR0185 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,559 $260 Implemented
AR0185 # 03 Y:2000 03 2000 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $16,446 $15,663 Implemented
AR0185 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $768 $300 Not Implemented
AR0185 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,764 $0 Not Implemented
AR0185 # 06 Y:2000 06 2000 $21,267 $59,881 Not Implemented
AR0185 # 07 Y:2000 07 2000 $464,750 $385,000 Not Implemented
OK0599 # 06 Y:2000 06 2000 $200,000 $300,000 Not Implemented
OK0599 # 07 Y:2000 07 2000 $224,052 $150 Not Implemented
OK0599 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $89,040 $0 Not Implemented
OK0599 # 04 Y:2000 04 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,139 $12,800 Not Implemented
OK0599 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,866 $1,300 Not Implemented
OK0599 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $777 $3,841 Not Implemented
OK0599 # 01 Y:2000 01 2000 COMBINE UTILITY METERS $15,427 $10,600 Not Implemented
AS0278 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,407 $120 Implemented
AS0278 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,451 $5,643 Not Implemented
AS0278 # 02 Y:2000 02 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $260 $120 Not Implemented