IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0292 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $480 Implemented
UM0292 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,943 $50 Implemented
MI0117 # 01 Y:2005 01 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $16,898 $1,350 Implemented
MI0117 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,463 $11,400 Implemented
MI0117 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,012 $906 Implemented
SF0304 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,751 $0 Implemented
AM0488 # 01 Y:2005 01 2005 MODIFY WORKLOAD $12,700 $9,000 Implemented
AM0488 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,000 Implemented
AM0488 # 05 Y:2005 05 2005 INSTALL SKYLIGHTS $2,215 $10,700 Implemented
AM0488 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,290 $6,576 Implemented
AM0488 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,600 $150 Implemented
AM0488 # 09 Y:2005 09 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Implemented
AM0488 # 10 Y:2005 10 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $930 $460 Implemented
UD0714 # 03 Y:2005 03 2005 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $12,150 $1,000 Implemented
UD0714 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $6,825 $3,000 Implemented
UD0714 # 07 Y:2005 07 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,772 $165 Implemented
UD0714 # 08 Y:2005 08 2005 USE MINIMUM SAFE OVEN VENTILATION $1,972 $150 Implemented
UD0714 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $1,311 $1,200 Implemented
UD0714 # 10 Y:2005 10 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,296 $0 Implemented
UD0714 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $1,138 $350 Implemented
UD0714 # 15 Y:2005 15 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $884 $0 Implemented
MS0267 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $30,643 $45,270 Implemented
MS0267 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,354 $141,305 Implemented
MS0267 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $228 Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented