IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0307 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,767 $53 Implemented
WV0307 # 03 Y:2004 03 2004 ISOLATE HOT OR COLD EQUIPMENT $3,113 $755 Implemented
WV0307 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,177 $210 Implemented
WV0307 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $0 Implemented
WV0307 # 12 Y:2004 12 2004 USE OPTIMUM THICKNESS INSULATION $278 $380 Implemented
WV0307 # 13 Y:2004 13 2004 INSULATE BARE EQUIPMENT $262 $260 Implemented
WV0307 # 14 Y:2004 14 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,224 $140 Implemented
CO0547 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $4,680 Implemented
CO0547 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $570 Implemented
CO0547 # 04 Y:2004 04 2004 COVER OPEN TANKS $1,200 $750 Implemented
CO0547 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $880 $240 Implemented
CO0547 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $300 $420 Implemented
UD0688 # 02 Y:2004 02 2004 USE OPTIMUM TEMPERATURE $143,925 $500,000 Implemented
UD0688 # 03 Y:2004 03 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $31,450 $7,250 Implemented
UD0688 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $12,457 $31,250 Implemented
UD0688 # 08 Y:2004 08 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,000 $1,040 Implemented
UD0688 # 09 Y:2004 09 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,165 $6,370 Implemented
UD0688 # 11 Y:2004 11 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,745 $470 Implemented
UD0688 # 13 Y:2004 13 2004 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,840 $0 Implemented
UD0688 # 14 Y:2004 14 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,460 $0 Implemented
UD0688 # 18 Y:2004 18 2004 INSULATE BARE EQUIPMENT $880 $1,820 Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
SU0158 # 01 Y:2003 01 2003 REPAIR OR REPLACE STEAM TRAPS $161,780 $4,536 Implemented