IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0545 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $2,000 Implemented
LE0545 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,466 $15,150 Implemented
LE0545 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,922 $570 Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0101 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $26,225 $30,000 Implemented
LE0101 # 07 Y:2001 07 2001 USE OPTIMUM THICKNESS INSULATION $5,167 $2,000 Implemented
LE0101 # 06 Y:2001 06 2001 CLOSE OFF UNNEEDED STEAM LINES $3,984 $2,000 Implemented
LE0101 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $89,879 $0 Implemented
LE0101 # 04 Y:2001 04 2001 IMPROVE LUBRICATION PRACTICES $3,752 $800 Implemented
LE0101 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $78,362 $2,500 Implemented
LE0101 # 01 Y:2001 01 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,696 $500 Implemented
ST0011 # 01 Y:1984 01 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,259 $0 Implemented
ST0011 # 03 Y:1984 03 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,083 $190 Implemented
ST0011 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $2,107 $2,290 Implemented
ST0011 # 05 Y:1984 05 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $138 $0 Implemented
ST0011 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $93 $45 Implemented
ST0011 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,210 $56 Implemented
ST0011 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $869 $435 Implemented
ST0011 # 09 Y:1984 09 1984 RECOVER WASTE HEAT FROM EQUIPMENT $668 $500 Implemented