Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0221 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $30,683 | $0 | Implemented |
DL0221 # 04 Y:2023 | 04 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $781 | $0 | Implemented |
DL0221 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $293 | $0 | Implemented |
DL0221 # 07 Y:2023 | 07 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $4,684 | $500 | Implemented |
DL0221 # 09 Y:2023 | 09 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $2,678 | $610 | Implemented |
DL0221 # 11 Y:2023 | 11 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $812 | $2,301 | Implemented |
DL0221 # 12 Y:2023 | 12 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,218 | $1,080 | Implemented |
DL0221 # 13 Y:2023 | 13 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $53,076 | $20,000 | Implemented |
DL0221 # 14 Y:2023 | 14 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,645 | $500 | Implemented |
DL0221 # 16 Y:2023 | 16 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,688 | $4,615 | Implemented |
DL0221 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,723 | $0 | Implemented |
WV0378 # 07 Y:2008 | 07 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,424 | $1,290 | Implemented |
WV0378 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $1,451 | $1,115 | Implemented |
WV0378 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,995 | $2,449 | Implemented |
WV0378 # 08 Y:2008 | 08 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $117 | $206 | Implemented |
WV0230 # 01 Y:2002 | 01 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,157 | $1,150 | Implemented |
WV0230 # 02 Y:2002 | 02 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,458 | $60 | Implemented |
WV0230 # 07 Y:2002 | 07 | 2002 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,097 | $800 | Implemented |
WV0230 # 09 Y:2002 | 09 | 2002 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $3,872 | $300 | Implemented |
WV0230 # 10 Y:2002 | 10 | 2002 | ELIMINATE/REDUCE REDUNDANT INSPECTIONS | $18,994 | $0 | Implemented |
HO0220 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $2,415 | $1,000 | Implemented |
HO0220 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $449 | $221 | Implemented |
HO0220 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,955 | $600 | Implemented |
HO0220 # 06 Y:2000 | 06 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,181 | $120 | Implemented |
HO0163 # 06 Y:1997 | 06 | 1997 | PAY BILLS ON TIME TO AVOID LATE FEES | $432 | $0 | Implemented |