IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0143 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,884 $4,500 Implemented
WM0053 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,677 $19,918 Implemented
WM0053 # 10 Y:2014 10 2014 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,892 $0 Implemented
WM0053 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $17,731 $1,292 Implemented
WM0053 # 13 Y:2014 13 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $512 Implemented
WM0038 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $149 $460 Implemented
WM0038 # 05 Y:2014 05 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $637 $1,519 Implemented
WM0038 # 04 Y:2014 04 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $622 $500 Implemented
WM0038 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,678 $1,768 Implemented
WM0038 # 02 Y:2014 02 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $172 $73 Implemented
WM0038 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,700 $16,042 Implemented
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
IC0090 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,643 $9,400 Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
WI0441 # 02 Y:2003 02 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,650 $16,800 Implemented
WI0441 # 03 Y:2003 03 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $2,550 $0 Implemented
WI0406 # 01 Y:2001 01 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,841 $0 Implemented
WI0222 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,038 $850 Implemented
WI0222 # 06 Y:1994 06 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $444 $0 Implemented
WI0222 # 02 Y:1994 02 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,553 $1,500 Implemented
WI0054 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,752 $4,500 Implemented
WI0054 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,279 $6,300 Implemented
WI0054 # 03 Y:1989 03 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $985 $500 Implemented
WI0054 # 02 Y:1989 02 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $91,315 $20,000 Implemented