Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0264 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,737 | $318 | Implemented |
MS0264 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,471 | $84,783 | Implemented |
IC0090 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $559 | $77 | Implemented |
IC0090 # 04 Y:2004 | 04 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,643 | $9,400 | Implemented |
IC0090 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,918 | $300 | Implemented |
IC0090 # 01 Y:2004 | 01 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $17,317 | $0 | Implemented |
CO0555 # 02 Y:2004 | 02 | 2004 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $900 | $580 | Implemented |
CO0555 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $186 | $260 | Implemented |
CO0555 # 01 Y:2004 | 01 | 2004 | REVISE SMOKE CLEANUP FROM OPERATIONS | $4,790 | $13,100 | Implemented |
BD0273 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,942 | $255 | Implemented |
BD0273 # 09 Y:2004 | 09 | 2004 | USE PLASTIC PALLETS INSTEAD OF WOOD | $22,476 | $27,625 | Implemented |
BD0273 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,606 | $4,270 | Implemented |
BD0273 # 03 Y:2004 | 03 | 2004 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $6,786 | $3,000 | Implemented |
BD0273 # 02 Y:2004 | 02 | 2004 | INSTALL WIND POWERED ELECTRIC GENERATOR | $10,682 | $50,000 | Implemented |
BD0273 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,813 | $3,470 | Implemented |
BD0273 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $2,608 | $1,725 | Implemented |
BD0273 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,185 | $2,900 | Implemented |
BD0273 # 08 Y:2004 | 08 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,098 | $0 | Implemented |
BD0273 # 10 Y:2004 | 10 | 2004 | $14,286 | $200 | Implemented | |
BD0272 # 11 Y:2004 | 11 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $448 | $650 | Implemented |
BD0272 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,875 | $1,700 | Implemented |
BD0272 # 06 Y:2004 | 06 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,880 | $20,000 | Implemented |
BD0272 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,568 | $4,325 | Implemented |
BD0272 # 16 Y:2004 | 16 | 2004 | $57,614 | $200 | Implemented | |
BD0272 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,459 | $1,260 | Implemented |