Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0545 # 06 Y:2023 | 06 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,790 | $27,000 | Not Implemented |
LE0545 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,441 | $31,059 | Not Implemented |
LE0545 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,520 | $2,000 | Implemented |
LE0545 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,260 | $1,500 | Not Implemented |
LE0545 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,466 | $15,150 | Implemented |
LE0545 # 01 Y:2023 | 01 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $2,922 | $570 | Implemented |
LE0380 # 09 Y:2014 | 09 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $607 | $2,000 | Not Implemented |
LE0380 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,740 | $4,950 | Not Implemented |
LE0380 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,916 | $5,000 | Not Implemented |
LE0380 # 06 Y:2014 | 06 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $22,320 | $54,000 | Not Implemented |
LE0380 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $938 | $1,936 | Not Implemented |
LE0380 # 04 Y:2014 | 04 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,824 | $2,960 | Not Implemented |
LE0380 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $593 | $520 | Not Implemented |
LE0380 # 02 Y:2014 | 02 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,774 | $800 | Not Implemented |
LE0380 # 01 Y:2014 | 01 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,389 | $780 | Not Implemented |
LE0170 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $425 | $825 | Not Implemented |
LE0170 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $440 | $560 | Not Implemented |
LE0170 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $367 | $0 | Implemented |
LE0170 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $952 | $0 | Implemented |
LE0170 # 02 Y:2003 | 02 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,647 | $7,000 | Implemented |
LE0170 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $210,423 | $300,000 | Not Implemented |
LE0101 # 02 Y:2001 | 02 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $26,225 | $30,000 | Implemented |
LE0101 # 07 Y:2001 | 07 | 2001 | USE OPTIMUM THICKNESS INSULATION | $5,167 | $2,000 | Implemented |
LE0101 # 06 Y:2001 | 06 | 2001 | CLOSE OFF UNNEEDED STEAM LINES | $3,984 | $2,000 | Implemented |
LE0101 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $89,879 | $0 | Implemented |