IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0306 # 09 Y:2024 09 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $650 $100 n/a
TT0306 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $494 $1,400 n/a
MU0043 # 01 Y:2023 01 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $116 $319 Not Implemented
MU0043 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,700 $7,887 Not Implemented
MU0043 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,957 $2,281 Not Implemented
MU0043 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $228 $480 Implemented
MU0043 # 05 Y:2023 05 2023 KEEP EQUIPMENT CLEAN $33 $0 Implemented
MU0043 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,803 $28,063 Implemented
MU0043 # 07 Y:2023 07 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $54 $51 Implemented
MU0043 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,395 $128,601 Not Implemented
MU0043 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,979 $158,490 Not Implemented
AS0560 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $112 $414 Not Implemented
AS0560 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,759 $9,900 Implemented
AS0560 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,025 $75,360 Implemented
AS0560 # 01 Y:2023 01 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $701,165 $7,692,249 Not Implemented
AS0560 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $51,728 $659,540 Implemented
AS0560 # 03 Y:2023 03 2023 UPGRADE OBSOLETE EQUIPMENT $21,635 $819,000 Implemented
MU0030 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,029 $1,089 Implemented
MU0030 # 02 Y:2023 02 2023 USE PHOTOCELL CONTROLS $110 $495 Implemented
MU0030 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $205 $472 Implemented
MU0030 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $227 $374 Implemented
MU0030 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $964 $3,110 Implemented
MU0030 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,540 $0 Implemented
MU0030 # 07 Y:2023 07 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $214 $450 Implemented
MU0030 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,497 $11,600 Implemented