IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0292 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,782 $480 Implemented
UM0292 # 04 Y:2005 04 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,943 $50 Implemented
UM0292 # 05 Y:2005 05 2005 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $1,193 $3,000 Not Implemented
UM0292 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $821 $368 Not Implemented
UM0204 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,500 $27,500 Not Implemented
UM0204 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $2,700 $4,970 Implemented
UM0204 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $1,220 Implemented
UM0204 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,160 $500 Implemented
UM0204 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $960 $1,000 Not Implemented
UM0204 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $375 Implemented
UM0166 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $244 $400 Not Implemented
UM0166 # 02 Y:2000 02 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,683 $1,700 Not Implemented
UM0166 # 03 Y:2000 03 2000 USE RADIANT HEATER FOR SPOT HEATING $2,815 $10,000 Not Implemented
UM0166 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,595 $11,900 Not Implemented
UM0166 # 05 Y:2000 05 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $562 $3,120 Not Implemented
UM0166 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,705 $5,925 Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,614 $500 Not Implemented
UM0161 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,437 $500 Implemented
UM0161 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,098 $656 Not Implemented
UM0161 # 05 Y:2000 05 2000 UPGRADE OBSOLETE EQUIPMENT $5,016 $5,700 Not Implemented
ND0270 # 01 Y:1997 01 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $227 $245 Not Implemented
ND0270 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $900 Not Implemented
ND0270 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $61 $170 Not Implemented
ND0270 # 04 Y:1997 04 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $250 $700 Not Implemented