Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
213
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0011 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,689 | $8,460 | Not Implemented |
IC0011 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,107 | $2,401 | Implemented |
IC0011 # 06 Y:2001 | 06 | 2001 | MODIFY WORKLOAD | $128,000 | $55,800 | Implemented |
IC0004 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,919 | $1,100 | Implemented |
IC0004 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $3,200 | Not Implemented |
IC0004 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,217 | $65,216 | Implemented |
IC0004 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $826 | $2,328 | Implemented |
IC0004 # 05 Y:2001 | 05 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $224,000 | $9,200 | Not Implemented |
IC0004 # 06 Y:2001 | 06 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $702,000 | $8,500 | Not Implemented |
WI0381 # 01 Y:2000 | 01 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $10,973 | $29,550 | Not Implemented |
WI0381 # 02 Y:2000 | 02 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,183 | $4,000 | Implemented |
WI0381 # 03 Y:2000 | 03 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $3,541 | $0 | Implemented |
WI0381 # 04 Y:2000 | 04 | 2000 | INSTALL AUTOMATIC STACK DAMPER | $1,157 | $1,000 | Implemented |
WI0381 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,869 | $8,223 | Not Implemented |
WI0381 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $242 | $300 | Not Implemented |
WI0381 # 07 Y:2000 | 07 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,293 | $840 | Not Implemented |
WI0381 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,028 | $1,300 | Implemented |
WI0381 # 09 Y:2000 | 09 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $945 | $0 | Not Implemented |
WI0381 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $417 | $687 | Not Implemented |
WI0381 # 11 Y:2000 | 11 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $184 | $0 | Not Implemented |
WI0381 # 12 Y:2000 | 12 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $124 | $300 | Implemented |
WI0369 # 01 Y:2000 | 01 | 2000 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,974 | $12,000 | Not Implemented |
WI0369 # 02 Y:2000 | 02 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $3,760 | $1,200 | Implemented |
WI0369 # 03 Y:2000 | 03 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $2,942 | $6,524 | Not Implemented |
WI0369 # 04 Y:2000 | 04 | 2000 | USE OPTIMUM THICKNESS INSULATION | $1,445 | $1,858 | Not Implemented |