Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
213
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0369 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $392 | $1,103 | Not Implemented |
WI0369 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,146 | $5,097 | Not Implemented |
WI0369 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $0 | Implemented |
WI0369 # 08 Y:2000 | 08 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $556 | $640 | Not Implemented |
BD0150 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,594 | $12,790 | Implemented |
BD0150 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,322 | $6,908 | Not Implemented |
BD0150 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,905 | $1,000 | Implemented |
BD0150 # 04 Y:1999 | 04 | 1999 | INSTALL OCCUPANCY SENSORS | $3,844 | $3,750 | Implemented |
BD0150 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,726 | $650 | Implemented |
BD0150 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $257 | $310 | Not Implemented |
BD0150 # 07 Y:1999 | 07 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $26,208 | $5,000 | Implemented |
BD0150 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $14,100 | $7,200 | Not Implemented |
BD0150 # 09 Y:1999 | 09 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $426 | $0 | Implemented |
WI0351 # 01 Y:1999 | 01 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $19,500 | $18,000 | Not Implemented |
WI0351 # 02 Y:1999 | 02 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $7,993 | $0 | Implemented |
WI0351 # 03 Y:1999 | 03 | 1999 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $7,922 | $500 | Not Implemented |
WI0351 # 04 Y:1999 | 04 | 1999 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,378 | $0 | Implemented |
WI0351 # 05 Y:1999 | 05 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $4,145 | $800 | Not Implemented |
WI0351 # 06 Y:1999 | 06 | 1999 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $4,075 | $0 | Not Implemented |
WI0351 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,173 | $1,920 | Implemented |
WI0351 # 08 Y:1999 | 08 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,365 | $4,374 | Implemented |
WI0351 # 09 Y:1999 | 09 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $843 | $800 | Implemented |
WI0348 # 01 Y:1999 | 01 | 1999 | ELIMINATE SHIFT | $28,000 | $40,000 | Implemented |
WI0348 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,083 | $0 | Not Implemented |
WI0348 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,913 | $18,000 | Not Implemented |