IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0369 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $392 $1,103 Not Implemented
WI0369 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,146 $5,097 Not Implemented
WI0369 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $0 Implemented
WI0369 # 08 Y:2000 08 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $556 $640 Not Implemented
BD0150 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,594 $12,790 Implemented
BD0150 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,322 $6,908 Not Implemented
BD0150 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,905 $1,000 Implemented
BD0150 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $3,844 $3,750 Implemented
BD0150 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,726 $650 Implemented
BD0150 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $257 $310 Not Implemented
BD0150 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $26,208 $5,000 Implemented
BD0150 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $14,100 $7,200 Not Implemented
BD0150 # 09 Y:1999 09 1999 PAY BILLS ON TIME TO AVOID LATE FEES $426 $0 Implemented
WI0351 # 01 Y:1999 01 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $19,500 $18,000 Not Implemented
WI0351 # 02 Y:1999 02 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,993 $0 Implemented
WI0351 # 03 Y:1999 03 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,922 $500 Not Implemented
WI0351 # 04 Y:1999 04 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,378 $0 Implemented
WI0351 # 05 Y:1999 05 1999 INSTALL TIMERS AND/OR THERMOSTATS $4,145 $800 Not Implemented
WI0351 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,075 $0 Not Implemented
WI0351 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,173 $1,920 Implemented
WI0351 # 08 Y:1999 08 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,365 $4,374 Implemented
WI0351 # 09 Y:1999 09 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $843 $800 Implemented
WI0348 # 01 Y:1999 01 1999 ELIMINATE SHIFT $28,000 $40,000 Implemented
WI0348 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,083 $0 Not Implemented
WI0348 # 03 Y:1999 03 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,913 $18,000 Not Implemented