IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0362 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,000 $1,950 Not Implemented
CO0362 # 02 Y:1996 02 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,260 $1,000 Not Implemented
CO0362 # 03 Y:1996 03 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,070 $1,400 Not Implemented
CO0362 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $188 Not Implemented
CO0362 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $380 $650 Implemented
DS0050 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,357 $8,346 Implemented
DS0050 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,931 $1,299 Implemented
DS0050 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,213 $220 Implemented
DS0050 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $895 $0 Implemented
DS0050 # 05 Y:1996 05 1996 CONVERT TO ELECTROSTATIC POWDER COATING $19,183 $4,200 Implemented
DS0050 # 06 Y:1996 06 1996 CONVERT TO ELECTROSTATIC POWDER COATING $64,427 $6,000 Implemented
UF0147 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,558 $334 Implemented
UF0147 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $578 $0 Implemented
UF0147 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,865 $2,300 Implemented
UF0147 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,820 $450 Not Implemented
UF0147 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $500 Implemented
UF0147 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,681 $8,000 Not Implemented
UF0147 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,994 $0 Implemented
WV0088 # 01 Y:1996 01 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,698 $4,800 Not Implemented
WV0088 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $1,450 Implemented
WV0088 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $354 $365 Implemented
WV0088 # 04 Y:1996 04 1996 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $22,916 $56,250 Not Implemented
WV0088 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $680 Implemented
WV0088 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $610 $747 Not Implemented
WV0088 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $2,734 $252 Implemented