IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,151

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0465 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $415 $660 Implemented
SF0095 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,141 $19,207 Not Implemented
SF0095 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,293 $6,804 Not Implemented
SF0095 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $725 $595 Not Implemented
SF0095 # 04 Y:1996 04 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $3,216 $2,840 Not Implemented
SF0095 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $3,017 $6,950 Not Implemented
SF0095 # 06 Y:1996 06 1996 COVER OPEN TANKS $10,274 $1,400 Not Implemented
SF0095 # 07 Y:1996 07 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,895 $6,395 Not Implemented
NC0094 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,416 $960 Implemented
NC0094 # 02 Y:1996 02 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $724 $400 Not Implemented
NC0094 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,343 $22,000 Not Implemented
NC0094 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,041 $0 Not Implemented
NC0094 # 05 Y:1996 05 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $1,770 $20 Not Implemented
NC0094 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $275 $250 Not Implemented
NC0094 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100 $420 Implemented
NC0094 # 08 Y:1996 08 1996 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $197 $50 Not Implemented
NC0094 # 09 Y:1996 09 1996 USE EVAPORATION TO CONCENTRATE MATERIAL $11,533 $25,000 Implemented
NC0094 # 10 Y:1996 10 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $21,205 $54,000 Not Implemented
MA0365 # 01 Y:1996 01 1996 UPGRADE CONTROLS ON COMPRESSORS $15,805 $20,000 Implemented
MA0365 # 02 Y:1996 02 1996 ELIMINATE/REDUCE AN OPERATION $9,443 $0 Implemented
MA0365 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,539 $840 Implemented
MA0365 # 04 Y:1996 04 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,290 $0 Implemented
MA0365 # 05 Y:1996 05 1996 INSTALL / REPAIR INSULATION ON STEAM LINES $2,173 $876 Implemented
MA0365 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,330 $640 Not Implemented
MA0365 # 07 Y:1996 07 1996 COMBINE UTILITY METERS $420 $0 Implemented