Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
78
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0547 # 04 Y:2004 | 04 | 2004 | COVER OPEN TANKS | $1,200 | $750 | Implemented |
CO0547 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $880 | $240 | Implemented |
CO0547 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,320 | $27,720 | Not Implemented |
CO0547 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,360 | $570 | Implemented |
CO0547 # 06 Y:2004 | 06 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $300 | $420 | Implemented |
CO0547 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,590 | $4,680 | Implemented |
CO0547 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,630 | $1,790 | Not Implemented |
CO0440 # 03 Y:1999 | 03 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $640 | $0 | Not Implemented |
CO0440 # 04 Y:1999 | 04 | 1999 | REDUCE SCRAP PRODUCTION | $9,880 | $1,000 | Implemented |
CO0440 # 05 Y:1999 | 05 | 1999 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $20,000 | $0 | Implemented |
CO0440 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,160 | $500 | Not Implemented |
CO0440 # 01 Y:1999 | 01 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $15,290 | $500 | Implemented |
CO0362 # 02 Y:1996 | 02 | 1996 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $2,260 | $1,000 | Not Implemented |
CO0362 # 05 Y:1996 | 05 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $380 | $650 | Implemented |
CO0362 # 04 Y:1996 | 04 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $125 | $188 | Not Implemented |
CO0362 # 03 Y:1996 | 03 | 1996 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $1,070 | $1,400 | Not Implemented |
CO0362 # 01 Y:1996 | 01 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,000 | $1,950 | Not Implemented |
CO0321 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $670 | $830 | Implemented |
CO0321 # 06 Y:1995 | 06 | 1995 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $200 | $100 | Not Implemented |
CO0321 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,070 | $410 | Implemented |
CO0321 # 04 Y:1995 | 04 | 1995 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $410 | $250 | Implemented |
CO0321 # 05 Y:1995 | 05 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $230 | $100 | Not Implemented |
CO0321 # 02 Y:1995 | 02 | 1995 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,600 | $9,960 | Not Implemented |
CO0292 # 08 Y:1994 | 08 | 1994 | INSULATE BARE EQUIPMENT | $360 | $610 | Not Implemented |
CO0292 # 02 Y:1994 | 02 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,930 | $2,400 | Implemented |