IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0547 # 04 Y:2004 04 2004 COVER OPEN TANKS $1,200 $750 Implemented
CO0547 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $880 $240 Implemented
CO0547 # 07 Y:2004 07 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,320 $27,720 Not Implemented
CO0547 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $570 Implemented
CO0547 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $300 $420 Implemented
CO0547 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $4,680 Implemented
CO0547 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,630 $1,790 Not Implemented
CO0440 # 03 Y:1999 03 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $640 $0 Not Implemented
CO0440 # 04 Y:1999 04 1999 REDUCE SCRAP PRODUCTION $9,880 $1,000 Implemented
CO0440 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $20,000 $0 Implemented
CO0440 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,160 $500 Not Implemented
CO0440 # 01 Y:1999 01 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,290 $500 Implemented
CO0362 # 02 Y:1996 02 1996 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,260 $1,000 Not Implemented
CO0362 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $380 $650 Implemented
CO0362 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $125 $188 Not Implemented
CO0362 # 03 Y:1996 03 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $1,070 $1,400 Not Implemented
CO0362 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,000 $1,950 Not Implemented
CO0321 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $670 $830 Implemented
CO0321 # 06 Y:1995 06 1995 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $200 $100 Not Implemented
CO0321 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,070 $410 Implemented
CO0321 # 04 Y:1995 04 1995 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $410 $250 Implemented
CO0321 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $230 $100 Not Implemented
CO0321 # 02 Y:1995 02 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,600 $9,960 Not Implemented
CO0292 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $360 $610 Not Implemented
CO0292 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,930 $2,400 Implemented