IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0545 # 06 Y:2023 06 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,790 $27,000 Not Implemented
LE0545 # 05 Y:2023 05 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,441 $31,059 Not Implemented
LE0545 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $2,000 Implemented
LE0545 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,260 $1,500 Not Implemented
LE0545 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,466 $15,150 Implemented
LE0545 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,922 $570 Implemented
LE0380 # 09 Y:2014 09 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $607 $2,000 Not Implemented
LE0380 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $4,950 Not Implemented
LE0380 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,916 $5,000 Not Implemented
LE0380 # 06 Y:2014 06 2014 USE RADIANT HEATER FOR SPOT HEATING $22,320 $54,000 Not Implemented
LE0380 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $938 $1,936 Not Implemented
LE0380 # 04 Y:2014 04 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,824 $2,960 Not Implemented
LE0380 # 03 Y:2014 03 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $520 Not Implemented
LE0380 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,774 $800 Not Implemented
LE0380 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,389 $780 Not Implemented
LE0170 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $425 $825 Not Implemented
LE0170 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $440 $560 Not Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0170 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $210,423 $300,000 Not Implemented
LE0101 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $26,225 $30,000 Implemented
LE0101 # 07 Y:2001 07 2001 USE OPTIMUM THICKNESS INSULATION $5,167 $2,000 Implemented
LE0101 # 06 Y:2001 06 2001 CLOSE OFF UNNEEDED STEAM LINES $3,984 $2,000 Implemented
LE0101 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $89,879 $0 Implemented