IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0092 # 02 Y:2004 02 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,325 $0 Not Implemented
IC0092 # 01 Y:2004 01 2004 INSTALL TIMERS AND/OR THERMOSTATS $4,234 $30 Not Implemented
IC0092 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,152 $6,700 Not Implemented
IC0092 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $1,544 Not Implemented
IC0092 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,120 $3,002 Not Implemented
IC0092 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $900 $2,340 Not Implemented
IC0092 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,783 $17,315 Not Implemented
IC0092 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,934 $38,438 Not Implemented
IC0092 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $4,634 $0 Not Implemented
MS0264 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $183 $249 Not Implemented
MS0264 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,356 $1,624 Not Implemented
MS0264 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,457 $480 Not Implemented
MS0264 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,737 $318 Implemented
MS0264 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $989 $944 Not Implemented
MS0264 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,471 $84,783 Implemented
IC0090 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,918 $300 Implemented
IC0090 # 01 Y:2004 01 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $17,317 $0 Implemented
IC0090 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,932 $425 Not Implemented
IC0090 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,643 $9,400 Implemented
IC0090 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $559 $77 Implemented
IC0090 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,205 $30,427 Not Implemented
CO0555 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $4,990 Not Implemented
CO0555 # 04 Y:2004 04 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $220 $420 Not Implemented
CO0555 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,890 $37,430 Not Implemented
CO0555 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $120 $390 Not Implemented