Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2209 # 08 Y:2022 08 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $79,738 $627,000 Not Implemented
KS2209 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $77,094 $526,518 Implemented
KS2209 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,163 $34,256 Implemented
KS2209 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,610 $1,085 Not Implemented
KS2209 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,315 $60 Not Implemented
KS2209 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,552 $5,960 Not Implemented
KS2209 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $593 $0 Implemented
KS2209 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,875 $1,600 Implemented
SU0514 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,996 $9,943 Not Implemented
SU0514 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,008 $0 Not Implemented
SU0514 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,430 $675 Not Implemented
SU0514 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,219 $1,953 Not Implemented
SU0514 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $49 Not Implemented
SU0514 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,774 $3,179 Not Implemented
CW0123 # 10 Y:2022 10 2022 USE POWER DURING OFF-PEAK PERIODS $1,949 $0 n/a
CW0123 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,158 $12,694 n/a
CW0123 # 08 Y:2022 08 2022 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION $7,698 $5,000 n/a
CW0123 # 07 Y:2022 07 2022 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $30,793 $45,000 n/a
CW0123 # 06 Y:2022 06 2022 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $2,357 $0 n/a
CW0123 # 05 Y:2022 05 2022 USE OPTIMUM TEMPERATURE $4,521 $3,500 n/a
CW0123 # 04 Y:2022 04 2022 IMPROVE LUBRICATION PRACTICES $27,999 $8,008 n/a
CW0123 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $105 n/a
CW0123 # 03 Y:2022 03 2022 REPLACE HEXAVALENT CHROMIUM SOLUTIONS WITH TRIVALENT SOLUTIONS $30,091 $55,770 n/a
CW0123 # 02 Y:2022 02 2022 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $1,422 $4,000 n/a
OR0751 # 01 Y:2022 01 2022 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,526 $140 Not Implemented