Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,093
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0216 # 05 Y:2001 | 05 | 2001 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $9,998 | $40,000 | Implemented |
OK0622 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,626 | $2,120 | Implemented |
OK0622 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,659 | $1,089 | Implemented |
OK0622 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,700 | $654 | Implemented |
OK0622 # 06 Y:2001 | 06 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $70,100 | $152,055 | Implemented |
OK0622 # 07 Y:2001 | 07 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $635,180 | $125,000 | Implemented |
WV0214 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,402 | $40 | Implemented |
WV0214 # 02 Y:2001 | 02 | 2001 | REPAIR OR REPLACE STEAM TRAPS | $1,680 | $2,680 | Implemented |
WV0214 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $555 | $588 | Implemented |
WV0214 # 06 Y:2001 | 06 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,955 | $1,500 | Implemented |
WV0214 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $20,000 | $7,000 | Implemented |
UD0623 # 02 Y:2001 | 02 | 2001 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $13,412 | $700 | Implemented |
UD0623 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $12,127 | $196 | Implemented |
UD0623 # 06 Y:2001 | 06 | 2001 | MINIMIZE WATER USAGE | $1,740 | $22 | Implemented |
UD0623 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,534 | $1,619 | Implemented |
UD0623 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $756 | $3,000 | Implemented |
UD0622 # 01 Y:2001 | 01 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,500 | $2,500 | Implemented |
UD0622 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,574 | $6,830 | Implemented |
UD0622 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $67 | $170 | Implemented |
UD0621 # 02 Y:2001 | 02 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,768 | $0 | Implemented |
UD0621 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,723 | $0 | Implemented |
UD0621 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,092 | $2,000 | Implemented |
UD0621 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $1,280 | $2,460 | Implemented |
LM0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,518 | $500 | Implemented |
LM0008 # 03 Y:2001 | 03 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $787 | $0 | Implemented |