IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0601 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $17,881 $5,000 Implemented
OK0601 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $14,040 $35,000 Implemented
UD0603 # 01 Y:2000 01 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $32,490 $3,200 Implemented
AM0377 # 01 Y:2000 01 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,190 $0 Implemented
AM0377 # 02 Y:2000 02 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $11,500 $6,100 Implemented
AM0377 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,870 $500 Implemented
AM0377 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $450 $110 Implemented
AM0377 # 06 Y:2000 06 2000 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $320 $0 Implemented
AM0377 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $230 $0 Implemented
AM0376 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $3,340 Implemented
AM0376 # 05 Y:2000 05 2000 ADD AREA LIGHTING SWITCHES $950 $640 Implemented
AM0376 # 06 Y:2000 06 2000 USE PHOTOCELL CONTROLS $730 $605 Implemented
AM0376 # 07 Y:2000 07 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $700 $350 Implemented
AM0376 # 08 Y:2000 08 2000 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $600 $1,030 Implemented
DS0169 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,062 $246 Implemented
DS0169 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,943 Implemented
DS0169 # 05 Y:2000 05 2000 BURN WASTE OIL FOR HEAT $5,018 $1,695 Implemented
DS0169 # 07 Y:2000 07 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,694 $4,083 Implemented
DS0169 # 08 Y:2000 08 2000 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $5,929 $12,962 Implemented
DS0169 # 09 Y:2000 09 2000 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $600 $1,288 Implemented
MS0165 # 01 Y:2000 01 2000 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $10,571 $980 Implemented
MS0165 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $329 $184 Implemented
MS0165 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $293 $54 Implemented
MS0165 # 04 Y:2000 04 2000 ELIMINATE/REDUCE AN OPERATION $1,457 $0 Implemented
GT0694 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,919 $1,150 Implemented