IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0358 # 01 Y:1999 01 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $97,790 $44,000 Implemented
WI0358 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $107 Implemented
NC0170 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,515 $0 Implemented
NC0170 # 03 Y:1999 03 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,462 $2,000 Implemented
IA0229 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,090 $294 Implemented
IA0229 # 09 Y:1999 09 1999 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $956 $143 Implemented
IA0228 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,046 $344 Implemented
IA0228 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $634 $581 Implemented
IA0228 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $2,320 Implemented
IA0228 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $226 $50 Implemented
IA0228 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,067 $0 Implemented
UL0228 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,001 $20 Implemented
OR0353 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,608 $800 Implemented
OR0353 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $1,927 $5,600 Implemented
ND0329 # 01 Y:1999 01 1999 CLEAR AND RENT EXISTING SPACE $40,000 $18,000 Implemented
ND0329 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $587 $100 Implemented
ND0329 # 10 Y:1999 10 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $181 $390 Implemented
BD0140 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,301 $500 Implemented
BD0140 # 06 Y:1999 06 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,041 $840 Implemented
BD0140 # 09 Y:1999 09 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,353 $10,000 Implemented
BD0140 # 11 Y:1999 11 1999 MINIMIZE WATER USAGE $1,471 $2,590 Implemented
BD0140 # 12 Y:1999 12 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $243,360 $500,000 Implemented
BD0140 # 13 Y:1999 13 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $107,799 $26,500 Implemented
BD0140 # 14 Y:1999 14 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,200 $16,000 Implemented
CO0444 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,280 $1,000 Implemented