Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,093
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0358 # 01 Y:1999 | 01 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $97,790 | $44,000 | Implemented |
WI0358 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $107 | Implemented |
NC0170 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,515 | $0 | Implemented |
NC0170 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,462 | $2,000 | Implemented |
IA0229 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,090 | $294 | Implemented |
IA0229 # 09 Y:1999 | 09 | 1999 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $956 | $143 | Implemented |
IA0228 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,046 | $344 | Implemented |
IA0228 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $634 | $581 | Implemented |
IA0228 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $2,320 | Implemented |
IA0228 # 06 Y:1999 | 06 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $226 | $50 | Implemented |
IA0228 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,067 | $0 | Implemented |
UL0228 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,001 | $20 | Implemented |
OR0353 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,608 | $800 | Implemented |
OR0353 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,927 | $5,600 | Implemented |
ND0329 # 01 Y:1999 | 01 | 1999 | CLEAR AND RENT EXISTING SPACE | $40,000 | $18,000 | Implemented |
ND0329 # 09 Y:1999 | 09 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $587 | $100 | Implemented |
ND0329 # 10 Y:1999 | 10 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $181 | $390 | Implemented |
BD0140 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,301 | $500 | Implemented |
BD0140 # 06 Y:1999 | 06 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,041 | $840 | Implemented |
BD0140 # 09 Y:1999 | 09 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $30,353 | $10,000 | Implemented |
BD0140 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $1,471 | $2,590 | Implemented |
BD0140 # 12 Y:1999 | 12 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $243,360 | $500,000 | Implemented |
BD0140 # 13 Y:1999 | 13 | 1999 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $107,799 | $26,500 | Implemented |
BD0140 # 14 Y:1999 | 14 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $31,200 | $16,000 | Implemented |
CO0444 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,280 | $1,000 | Implemented |