IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,224

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0491 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,610 $1,000 Implemented
KU0491 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $760 $2,630 Implemented
KU0491 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $780 Implemented
KU0491 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $210 Implemented
KU0491 # 09 Y:1998 09 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,560 $0 Implemented
KU0491 # 11 Y:1998 11 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $34,550 $60,000 Implemented
ME0242 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,934 $2,500 Implemented
ME0242 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,602 $11,858 Implemented
ME0242 # 03 Y:1998 03 1998 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,513 $8,600 Implemented
ME0242 # 04 Y:1998 04 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,383 $0 Implemented
ME0242 # 05 Y:1998 05 1998 USE OPTIMUM THICKNESS INSULATION $1,126 $1,700 Implemented
ME0242 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $591 $2,260 Implemented
ME0242 # 08 Y:1998 08 1998 USE OPTIMUM THICKNESS INSULATION $90 $160 Implemented
ME0242 # 09 Y:1998 09 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,922 $3,036 Implemented
ND0296 # 02 Y:1998 02 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,246 $126 Implemented
ND0296 # 04 Y:1998 04 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $880 $854 Implemented
UD0545 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,984 $10,116 Implemented
TN0630 # 03 Y:1998 03 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,800 $5,900 Implemented
TN0629 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $62,560 $5,700 Implemented
TN0629 # 04 Y:1998 04 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $21,285 $25,800 Implemented
TN0629 # 07 Y:1998 07 1998 REDESIGN PROCESS $2,675 $1,100 Implemented
TN0629 # 09 Y:1998 09 1998 METER WASTE WATER $1,210 $2,980 Implemented
SD0194 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,625 $5,210 Implemented
SD0194 # 03 Y:1998 03 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,430 $450 Implemented
SD0194 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $706 $1,150 Implemented