IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0578 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $4,500 $0 Implemented
TN0578 # 04 Y:1996 04 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,126 $8,500 Implemented
IA0135 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,026 $8,829 Implemented
IA0135 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,718 $9,049 Implemented
IA0135 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $853 $268 Implemented
IA0135 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48 $236 Implemented
IA0135 # 09 Y:1996 09 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,217 $0 Implemented
IA0135 # 12 Y:1996 12 1996 USE PLASTIC PALLETS INSTEAD OF WOOD $325 $400 Implemented
WI0263 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,504 $0 Implemented
WI0263 # 05 Y:1996 05 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $862 $2,000 Implemented
WI0263 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,442 $115 Implemented
WI0263 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $241 $640 Implemented
UL0153 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,723 $85 Implemented
UD0485 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $600 $0 Implemented
UD0485 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,528 $250 Implemented
UD0485 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,249 $12,150 Implemented
UD0485 # 06 Y:1996 06 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $18,918 $6,000 Implemented
CO0360 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $13,520 $6,200 Implemented
CO0360 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,200 $160 Implemented
CO0360 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,640 $1,870 Implemented
CO0360 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,110 $40 Implemented
CO0360 # 06 Y:1996 06 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,030 $1,080 Implemented
CO0360 # 07 Y:1996 07 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $155 $187 Implemented
CO0360 # 08 Y:1996 08 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $650 $1,580 Implemented
CO0361 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $35,150 $17,480 Implemented