IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

187

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0243 # 10 Y:1992 10 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $297 $400 Implemented
OK0374 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $1,003 Implemented
OK0374 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,845 $76,172 Implemented
OK0374 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,244 $0 Implemented
OK0374 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,395 $5,750 Implemented
UF0027 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $642 Implemented
UF0027 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $550 Implemented
UF0027 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,380 $4,766 Implemented
UF0027 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $1,445 $1,200 Implemented
UF0027 # 06 Y:1992 06 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,567 $2,820 Implemented
UF0027 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,518 $49,969 Implemented
WI0143 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $5 Implemented
WI0143 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $2,584 $600 Implemented
WI0143 # 06 Y:1992 06 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,854 $0 Implemented
KU0365 # 02 Y:1992 02 1992 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $6,266 $31,766 Implemented
KU0365 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,768 $887 Implemented
KU0365 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,302 $540 Implemented
KU0365 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $397 $250 Implemented
MO0051 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,392 $840 Implemented
MO0051 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $1,015 Implemented
MO0051 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,681 $2,200 Implemented
MO0051 # 07 Y:1992 07 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $43 $110 Implemented
MO0051 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,200 $240 Implemented
MO0051 # 10 Y:1992 10 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $479 $0 Implemented
RU0137 # 01 Y:1992 01 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $680 $426 Implemented