Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
321
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0340 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,531 | $5,336 | Implemented |
MZ0340 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,529 | $720 | Implemented |
MZ0340 # 02 Y:2023 | 02 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,688 | $320 | Implemented |
MZ0340 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $618 | $260 | Implemented |
MZ0326 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $1,106 | $2,244 | Implemented |
MZ0326 # 11 Y:2022 | 11 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $384,733 | $2,868,753 | Implemented |
MZ0326 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,449 | $3,200 | Implemented |
MZ0326 # 03 Y:2022 | 03 | 2022 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,085 | $144 | Implemented |
MZ0326 # 07 Y:2022 | 07 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $597 | $580 | Implemented |
MZ0326 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,930 | $12,076 | Implemented |
MZ0315 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,404 | $480 | Implemented |
MZ0315 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,771 | $14,420 | Implemented |
MZ0315 # 06 Y:2022 | 06 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $16,735 | $15,782 | Implemented |
MZ0315 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,818 | $360 | Implemented |
MZ0315 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,247 | $250 | Implemented |
MZ0321 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,760 | $11,000 | Implemented |
MZ0321 # 03 Y:2021 | 03 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $46,936 | $63,900 | Implemented |
MZ0321 # 04 Y:2021 | 04 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $23,778 | $5,120 | Implemented |
MZ0321 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,197 | $657 | Implemented |
MZ0300 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,784 | $200 | Implemented |
MZ0300 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,598 | $1,650 | Implemented |
MZ0286 # 02 Y:2020 | 02 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,624 | $9,088 | Implemented |
MZ0286 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,970 | $2,000 | Implemented |
MZ0276 # 01 Y:2019 | 01 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $155 | $60 | Implemented |
MZ0276 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,641 | $180 | Implemented |