IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS029 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,313 $4,270 Implemented
MAS029 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $0 Implemented
MAS029 # 01 Y:2012 01 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,149 $500 Implemented
MA0686 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,021 $1,800 Implemented
MA0686 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,501 $1,000 Implemented
MA0686 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,860 $86,160 Implemented
ME0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,027 $9,340 Implemented
ME0259 # 11 Y:1999 11 1999 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $917 $0 Implemented
ME0259 # 09 Y:1999 09 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $14,100 $955,000 Implemented
ME0259 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $365 $400 Implemented
ME0259 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,332 $5,655 Implemented
ME0259 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Implemented
ME0259 # 04 Y:1999 04 1999 COMBINE UTILITY METERS $456 $230 Implemented
ME0259 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $450 $720 Implemented
ME0259 # 08 Y:1999 08 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $285 $215 Implemented
MA0351 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,105 $2,750 Implemented
MA0351 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $1,777 $770 Implemented
MA0344 # 03 Y:1995 03 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,909 $0 Implemented
MA0344 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $798 Implemented
MA0344 # 06 Y:1995 06 1995 REDUCE VENTILATION AIR $344 $0 Implemented
MA0292 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $503 $300 Implemented
MA0292 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $327 $961 Implemented
MA0292 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $939 $100 Implemented
MA0292 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,012 $1,062 Implemented
MA0292 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,154 $0 Implemented