IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0746 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,874 $2,960 Implemented
MA0746 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,323 $362 Implemented
MA0746 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,299 $3,000 Implemented
MA0746 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $2,100 Implemented
MA0746 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $13,483 $3,785 Implemented
MA0746 # 01 Y:2015 01 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $14,457 $7,354 Implemented
MA0746 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,017 $88,800 Implemented
MA0728 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,512 $25,775 Implemented
MA0728 # 02 Y:2014 02 2014 REPLACE BOILER $10,114 $30,450 Implemented
MA0728 # 03 Y:2014 03 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,940 $6,500 Implemented
ME0257 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $2,268 $879 Implemented
ME0257 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $702 $300 Implemented
ME0257 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,980 $6,797 Implemented
ME0257 # 03 Y:1999 03 1999 ADVERTISE PRODUCT OR SERVICE $2,993 $0 Implemented
ME0257 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $7,900 $1,000 Implemented
ME0257 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,536 $21,031 Implemented
ME0257 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
ME0257 # 09 Y:1999 09 1999 REDUCE SCRAP PRODUCTION $66,200 $20,000 Implemented
MA0329 # 09 Y:1995 09 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $333 Implemented
MA0329 # 08 Y:1995 08 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,463 $300 Implemented
MA0329 # 07 Y:1995 07 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,306 $0 Implemented
MA0329 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,356 $1,200 Implemented
MA0329 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,663 $9,216 Implemented
MA0329 # 04 Y:1995 04 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,392 $0 Implemented
MA0329 # 03 Y:1995 03 1995 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,088 $1,950 Implemented