Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
524
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0449 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,413 | $3,096 | n/a |
MI0449 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,976 | $61,998 | n/a |
MI0449 # 07 Y:2024 | 07 | 2024 | METER WASTE WATER | $1,195 | $900 | n/a |
MI0449 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,646 | $700 | n/a |
MI0449 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,015 | $1,980 | n/a |
MI0449 # 02 Y:2024 | 02 | 2024 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $15,070 | $13,480 | n/a |
MI0449 # 06 Y:2024 | 06 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,254 | $320 | n/a |
MI0447 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $3,750 | n/a |
MI0447 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,651 | $7,497 | n/a |
MI0447 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,899 | $1,980 | n/a |
MI0447 # 01 Y:2024 | 01 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $636,028 | $600,000 | n/a |
MI0447 # 06 Y:2024 | 06 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $792 | $320 | n/a |
MI0447 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,522 | $700 | n/a |
UF0617 # 05 Y:2024 | 05 | 2024 | REDUCE GLAZED AREAS IN BUILDINGS | $1,046 | $1,720 | n/a |
UF0617 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,700 | $322,608 | n/a |
UF0617 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,599 | $49,000 | n/a |
UF0617 # 08 Y:2024 | 08 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $904 | $1,752 | n/a |
UF0617 # 07 Y:2024 | 07 | 2024 | AUTOMATE FINISHING PROCESS | $74,880 | $100,000 | n/a |
UF0617 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,230 | $5,280 | n/a |
UF0617 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,015 | $12,416 | n/a |
UF0617 # 06 Y:2024 | 06 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $890,327 | $117,000 | n/a |
MI0442 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,876 | $16,028 | n/a |
MI0442 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,002 | $70 | n/a |
MI0442 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,720 | $159,280 | n/a |
MI0442 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $16,134 | $240 | n/a |