IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,195

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0757 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,547 $1,600 Implemented
UD0757 # 04 Y:2007 04 2007 USE OPTIMUM TEMPERATURE $8,681 $0 Not Implemented
UD0757 # 05 Y:2007 05 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,031 $0 Implemented
UD0757 # 06 Y:2007 06 2007 USE OPTIMUM THICKNESS INSULATION $5,633 $606 Not Implemented
UD0757 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $5,019 $0 Not Implemented
UD0757 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,293 $0 Implemented
UD0757 # 09 Y:2007 09 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,300 $992 Not Implemented
UD0752 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,473 $40,463 Implemented
UD0752 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,542 $0 Implemented
UD0752 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,798 $225 Implemented
UD0752 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,557 $0 Implemented
UD0752 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,592 $0 Implemented
UD0741 # 01 Y:2006 01 2006 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $65,250 $10,000 Not Implemented
UD0741 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,883 $133,640 Not Implemented
UD0741 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $18,067 $110 Implemented
UD0741 # 04 Y:2006 04 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,240 $0 Implemented
UD0741 # 05 Y:2006 05 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,135 $2,800 Implemented
UD0741 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,387 $3,150 Not Implemented
UD0741 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,802 $840 Implemented
UD0741 # 08 Y:2006 08 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $0 Implemented
UD0741 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,261 $0 Implemented
UD0738 # 01 Y:2006 01 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $91,800 $6,000 Implemented
UD0738 # 02 Y:2006 02 2006 RECOVER AND REUSE WASTE MATERIAL $28,944 $2,000 Not Implemented
UD0738 # 03 Y:2006 03 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $8,313 $0 Implemented
UD0738 # 04 Y:2006 04 2006 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,084 $0 Implemented