IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,451

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0333 # 09 Y:2006 09 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,628 $3,000 Not Implemented
NC0333 # 10 Y:2006 10 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,550 $4,000 Not Implemented
UF0376 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,968 $27,399 Not Implemented
UF0376 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,222 $2,053 Not Implemented
UF0376 # 03 Y:2006 03 2006 ADD AREA LIGHTING SWITCHES $878 $2,646 Not Implemented
UF0376 # 04 Y:2006 04 2006 INSTALL BACK-UP EQUIPMENT $1,632,456 $5,315 Not Implemented
UF0376 # 05 Y:2006 05 2006 AIR CONDITION ONLY SPACE NECESSARY $1,014 $3,200 Not Implemented
UF0376 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $150 $1,480 Not Implemented
UF0376 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $0 Not Implemented
UF0376 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $148 $0 Not Implemented
BD0301 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $94,570 $91,000 Implemented
BD0301 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $43,599 $22,780 Implemented
BD0301 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,786 $1,800 Implemented
BD0301 # 04 Y:2006 04 2006 USE PHOTOCELL CONTROLS $1,759 $1,750 Implemented
BD0301 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $500 Implemented
BD0301 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $911 $1,960 Not Implemented
BD0301 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $763 $500 Implemented
BD0301 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $342 $350 Implemented
BD0301 # 09 Y:2006 09 2006 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $40,050 $22,800 Not Implemented
BD0301 # 10 Y:2006 10 2006 AUTOMATE FINISHING PROCESS $1,669,200 $285,000 Implemented
BD0301 # 11 Y:2006 11 2006 PAY BILLS ON TIME TO AVOID LATE FEES $995 $0 Implemented
AS0414 # 01 Y:2006 01 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $813,934 $3,030,000 Not Implemented
AS0414 # 02 Y:2006 02 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $28,518 $20,000 Implemented
AS0414 # 03 Y:2006 03 2006 PAY BILLS ON TIME TO AVOID LATE FEES $17,731 $200 Implemented
MI0123 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,833 $56,238 Not Implemented