IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15,103

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0024 # 02 Y:1988 02 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,080 $3,440 Not Implemented
AM0024 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $195 $792 Implemented
CO0113 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,170 $9,000 Not Implemented
CO0113 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,210 $3,000 Not Implemented
CO0113 # 03 Y:1988 03 1988 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $4,225 $4,500 Implemented
CO0113 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $311 $600 Implemented
CO0113 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $302 $0 Not Implemented
CO0113 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,920 $1,000 Implemented
CO0113 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $2,478 Not Implemented
OR0016 # 01 Y:1988 01 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,173 $0 Implemented
OR0016 # 02 Y:1988 02 1988 INSTALL SET-BACK TIMERS $4,547 $270 Implemented
OR0016 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,304 $200 Implemented
OR0016 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $147 $200 Implemented
OR0016 # 05 Y:1988 05 1988 OPTIMIZE PLANT POWER FACTOR $1,972 $4,110 Not Implemented
UD0254 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,969 $45,557 Implemented
UD0254 # 02 Y:1988 02 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,916 $2,000 Not Implemented
UD0254 # 03 Y:1988 03 1988 USE RADIANT HEATER FOR SPOT HEATING $8,595 $15,000 Implemented
CO0111 # 01 Y:1988 01 1988 REDUCE VENTILATION AIR $4,226 $834 Implemented
CO0111 # 02 Y:1988 02 1988 AIR CONDITION ONLY SPACE NECESSARY $2,849 $14,000 Not Implemented
CO0111 # 03 Y:1988 03 1988 REVISE SMOKE CLEANUP FROM OPERATIONS $4,887 $17,500 Not Implemented
CO0111 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,622 $1,800 Implemented
CO0111 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,251 $600 Implemented
CO0111 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $200 Implemented
CO0111 # 07 Y:1988 07 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,440 $800 Not Implemented
CO0111 # 08 Y:1988 08 1988 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,950 $5,900 Not Implemented