Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
15,376
matching recommendationsSIC | 35 | Industrial Machinery And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0286 # 02 Y:2020 | 02 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,624 | $9,088 | Implemented |
MZ0286 # 03 Y:2020 | 03 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,749 | $480 | Not Implemented |
MZ0286 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,970 | $2,000 | Implemented |
MZ0286 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,616 | $13,442 | Not Implemented |
MZ0286 # 06 Y:2020 | 06 | 2020 | INSTALL OCCUPANCY SENSORS | $118 | $200 | Not Implemented |
MZ0286 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $238 | $40 | Not Implemented |
SD0594 # 01 Y:2020 | 01 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,740 | $8,700 | Not Implemented |
SD0594 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,323 | $11,533 | Not Implemented |
SD0594 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,863 | $0 | Not Implemented |
SD0594 # 04 Y:2020 | 04 | 2020 | PAY UTILITY BILLS ON TIME | $25,266 | $0 | Not Implemented |
AM0804 # 01 Y:2020 | 01 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $124,900 | $15,000 | Not Implemented |
AM0804 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $11,260 | $16,200 | Not Implemented |
AM0804 # 03 Y:2020 | 03 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,800 | $0 | Not Implemented |
AM0804 # 04 Y:2020 | 04 | 2020 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $630 | $100 | Implemented |
AM0804 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $505 | $13 | Implemented |
MA0818 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,422 | $970 | Not Implemented |
MA0818 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,320 | $9,808 | Implemented |
MA0818 # 03 Y:2020 | 03 | 2020 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,714 | $5,600 | Not Implemented |
MA0818 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $837 | $4,000 | Not Implemented |
MA0818 # 05 Y:2020 | 05 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $789 | $1,700 | Implemented |
MA0818 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $782 | $2,450 | Not Implemented |
MA0818 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $746 | $500 | Implemented |
WV0593 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $16,054 | $69,828 | Implemented |
WV0593 # 02 Y:2020 | 02 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $9,611 | $20,330 | Implemented |
WV0593 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,095 | $4,464 | Not Implemented |